Ripley Castle
The scope
of works was 15 months to include the provision of Cold Water services,
Domestic Hot Water Services, Natural Gas Supply, Low Temperature
Hot Water heating and Central Refrigeration Plant.
As Ripley Castle is a Grade 1 listed building all service routes
had to be concealed wherever possible and as noise was also a key
issue all plant was selected to be as quite as possible.
Specially manufactured radiators were installed
utilising all iron pipework.
|