Home About us Case Studies Contact us Services



Ripley Castle

The scope of works was 15 months to include the provision of Cold Water services, Domestic Hot Water Services, Natural Gas Supply, Low Temperature Hot Water heating and Central Refrigeration Plant.

As Ripley Castle is a Grade 1 listed building all service routes had to be concealed wherever possible and as noise was also a key issue all plant was selected to be as quite as possible.

Specially manufactured radiators were installed utilising all iron pipework.